7743 BALTIMORE AVE., COLLEGE PARK, MD REPORT TO: KEVIN SEARS START TIME & DATE: ASAP APPROX. DURATION: UNKNOWN TYPE OF WORK: ELECTRICAL – INSTALL 3/4″ RIGID FOR FA, PLANNED WORK SCHEDULE IS M -F (5) 8’S WITH 2HRS OT EACH DAY PRE-HIRE DRUG TESTING VALID DRIVER LICENSE, AND RELIABLE TRANSPORTATION REPORT TO: REBECCA JENKINS START TIME & DATE: 6:00AM ASAP APPROX. DURATION: UNKNOWN TYPE OF WORK: DATA CENTER M-F (5) 8’S WITH 2HRS PLANNED OT EACH DAY PRE-HIRE DRUG TESTING **MUST PASS BACKGROUND CHECK AFTER HIRING ** REPORT TO: REBECCA JENKINS START TIME & DATE: ASAP APPROX. DURATION: UNKNOWN TYPE OF WORK: DATA CENTER, WITH PLANNED OT PRE-HIRE DRUG TESTING **MUST PASS BACKGROUND CHECK AFTER HIRING ** REPORT TO: REBECCA JENKINS START TIME & DATE: 6:00AM APPROX. DURATION: UNKNOWN TYPE OF WORK: MUST BE A U.S CITIZEN AND HAVE 2 FORMS OF I.D. (BRING THIS WITH YOU AT ORIENTATION), PLANNED WORK SCHEDULE OF (5) 8S AND (1) 8S PRE-HIRE DRUG TESTING REPORT TO: REBECCA JENKINS START TIME & DATE: ASAP APPROX. DURATION: UNKNOWN TYPE OF WORK: DATA CENTER, WITH PLANNED OT PRE-HIRE DRUG TESTING OSHA 10 PREFERRED OR TRAINING PROVIDED WHEN HIRED WMATA TAGGING RELAY AND SCADA UPGRADES REPORT TO: PAUL ROACHE START TIME & DATE: 6:00AM ASAP APPROX. DURATION: 2 YEARS TYPE OF WORK: UPGRADES TO TRACTION POWER EQUIPMENT AND CONTROLS. TERMINATIONS, VERY HEAVY LIFTING OF 1000 MCM CABLES PRE-HIRE DRUG TESTING MID-ATLANTIC POWER 47567 REPORT TO: RICHARD BANKHEAD START TIME & DATE: 6:30AM ASAP APPROX. DURATION: 3 MONTHS TYPE OF WORK: DATA CENTER TENANT FIT OUT INSIDE SECURED/ OPERATIONAL DATA CENTERS PRE-HIRE DRUG TESTING DULLES/UNITED AIRLINES TERMINAL REPORT TO: DEBI MAROSY START TIME & DATE: 5:30AM ASAP APPROX. DURATION: 12 MONTHS TYPE OF WORK: BRANCH CONDUIT/FEEDER CONDUIT/LIGHTING/POWER/FA-WORKING INDOORS, SOME OT AVAILABLE PRE-HIRE DRUG TESTING MANASSAS/ASHBURN/STERLING, VA REPORT TO: DEBI MAROSY START TIME & DATE: ASAP APPROX. DURATION: 12 MONTHS TYPE OF WORK: DATA CENTERS-ELECTRICAL MAINTENANCE, TENANT FIT-OUTS, INFRASTRUCTURE MODIFICATIONS PRE-HIRE DRUG TESTING MANASSAS/ASHBURN/STERLING, VA REPORT TO: DEBI MAROSY START TIME & DATE: ASAP APPROX. DURATION: 12 MONTHS TYPE OF WORK: DATA CENTERS-CAMERAS, DOOR HARDWARE, ACCESS CONTROL, SECURITY PANEL TERMINATIONS, CONDUIT BENDING, SECURITY EXPERIENCE PRE-HIRE DRUG TESTING POWER SOLUTIONS 47687 REPORT TO: BRIAN ARSENAULT START TIME & DATE: 7:00AM ASAP APPROX. DURATION: UNKNOWN TYPE OF WORK: DATA CENTER, OT AVAILABLE PRE-HIRE DRUG TESTING POWER SOLUTIONS 47920 REPORT TO: BRIAN ARSENAULT START TIME & DATE: 7:00AM ASAP APPROX. DURATION: UNKNOWN TYPE OF WORK: DATA CENTER PRE-HIRE DRUG TESTING POWER SOLUTIONS 47921 REPORT TO: BRIAN ARSENAULT START TIME & DATE: 7:00AM ASAP APPROX. DURATION: UNKNOWN TYPE OF WORK: DATA CENTER, OT AVAILABLE PRE-HIRE DRUG TESTING POWER SOLUTIONS 47946 REPORT TO: BRIAN ARSENAULT START TIME & DATE: 7:00AM ASAP APPROX. DURATION: UNKNOWN TYPE OF WORK: DATA CENTER PRE-HIRE DRUG TESTING 2 DAY ORIENTATION AT SHOP PRIOR TO GOING TO JOBSITE POWER SOLUTIONS 48003 REPORT TO: BRIAN ARSENAULT START TIME & DATE: 7:00AM 03/17/26 APPROX. DURATION: UNKNOWN TYPE OF WORK: BMS/CONTROL, DATA CENTERS, BACKGROUND CHECK, PLANNED OT PRE-HIRE DRUG TESTING POWER SOLUTIONS 48015 REPORT TO: BRIAN ARSENAULT START TIME & DATE: 7:00AM 03/17/26 APPROX. DURATION: UNKNOWN TYPE OF WORK: DATA CENTERS, BACKGROUND CHECK PRE-HIRE DRUG TESTING POWER SOLUTIONS 48017 VARIOUS NORTHERN VA LOCATIONS REPORT TO: BRIAN ARSENAULT START TIME & DATE: 7:00AM 03/17/26 APPROX. DURATION: UNKNOWN TYPE OF WORK: FIRE ALARM, NICET/FOREMAN EXP PREFERRED PRE-HIRE DRUG TESTING REPORT TO: CHASE DYSON START TIME & DATE: 6:00AM ASAP APPROX. DURATION: UNKNOWN TYPE OF WORK: ELECTRICAL WORK INSIDE **MUST HAVE AND MAINTAIN A CLEARANCE LEVEL OF TS/SCI OR HIGHER ** 44710 PERFORMANCE CIR, ASHBURN, VA REPORT TO: ANDREW POTTS START TIME & DATE: 6:00AM 03/17/26 APPROX. DURATION: 10 MONTHS TYPE OF WORK: DATA CENTER 22165 BEAUMEADE CIR., ASHBURN, VA REPORT TO: JOE CORBIN START TIME & DATE: 6:00AM 03/17/26 APPROX. DURATION: 8 MONTHS TYPE OF WORK: DATA CENTER 22190 LOUDOUN COUNTY PKWY, ASHBURN, VA REPORT TO: STEVEN NICHOLS START TIME & DATE: 6:00AM 03/17/26 APPROX. DURATION: 5 MONTHS TYPE OF WORK: CONTROLS, POSSIBLE OT REPORT TO: RYAN KELLY START TIME & DATE: 6:00AM 03/17/26 APPROX. DURATION: 24 MONTHS TYPE OF WORK: DATA CENTER, POSSIBLE OT REPORT TO: NICK COMPOFELICE START TIME & DATE: 6:00AM 03/17/26 APPROX. DURATION: 8 MONTHS TYPE OF WORK: DATA CENTER REPORT TO: ANDREW MORGAN START TIME & DATE: 6:00AM 03/17/26 APPROX. DURATION: 12 MONTHS TYPE OF WORK: QA/QC/CX. QA/QC EXPERIENCE PREFERRED, LOTO/ENERGY MARSHALL EXPERIENCE PREFERRED, NEC PROFICIENCY REPORT TO: MIKE ROBINSON START TIME & DATE: 5:30AM ASAP APPROX. DURATION: 1 YEAR TYPE OF WORK: INDUSTRIAL, RGS, PVC, COATED, RGS CONDUIT, OUTSIDE WORK AT AN ACTIVE WASTEWATER TREATMENT PLANT
Ad
Contact
Contact Us
Log in to contact support — replies go straight to your inbox.